DESCRIPTION
GatorSktch Architects served as design consultant to Nick Jones, Architect. The study included analysis of existing conditions for all existing buildings at the fair grounds with design suggestions for reuse of the major structures, cost estimates and listing of alternatives. This project was completed during spring 2006.
CONSTRUCTION COST
$30,000